Grey composite deck with mitred steps and built-in planters on a Sarnia home

Services

Custom deck building in Sarnia and Lambton County

A deck is the room you use most from May to October, so it should be built like a room. We design around how you actually use the yard — where the sun lands at six o'clock, where the barbecue goes, whether you need the stairs off the side instead of the back — and then we build it properly.

We do everything from a straightforward pressure-treated platform off a back door to multi-level composite decks with built-in seating, planters and privacy screens. If there's an old deck there now, we take it away.

What we build

Decks we build

  • Pressure-treated decks

    The workhorse. Strong, affordable, stains well.

  • Composite decks

    No staining, no splinters, colour that holds up.

  • Multi-level decks

    Steps down to a lower patio or up to a walkout.

  • Wrap-around decks

    Around a corner or the full length of the house.

  • Built-in seating and planters

    Bench seating, planter boxes, storage under the lids.

  • Stairs and railings

    Code-height railings in wood, aluminum, glass or cable.

  • Pergolas and privacy screens

    Shade over the seating area and cover from the neighbours.

Process

How it works

  1. 01

    Free on-site visit

    We come out, walk the property, take measurements and talk through what you want. Usually half an hour.

  2. 02

    Design and written quote

    You get a layout, a materials list and a fixed price in writing. Everything is itemised so you can see where the money goes.

  3. 03

    Build

    A small crew, on site until it's done. We keep the yard tidy at the end of every day and tell you what's happening next.

  4. 04

    Walkthrough and cleanup

    We walk it with you, fix anything you flag, haul away the offcuts and rake out the ground behind us.

Detail

Materials and build notes

Framing is what you're paying for

Joists at 12 inches on centre instead of 16 makes a deck feel solid underfoot and is required for most composite boards run on an angle. We use proper joist hangers, structural screws and a ledger flashed and bolted to the house — not nailed.

Footings and frost

Deck footings in this region go below the frost line, sized to the load they carry. A deck that has heaved is a footing that was too shallow or too small. Anything attached to the house needs it done right or the ledger tears at the siding.

Composite vs wood

Composite costs more up front and roughly pays for itself in stain, sanding and weekends over about ten years. Wood is warmer to look at, cheaper to build and fine if you're happy to re-coat it every couple of seasons. Both need the same quality of frame underneath.

Water and airflow

Decks rot from the top of the joists down. We tape joists on composite builds, keep a gap between boards for drainage, and leave the skirting ventilated so air moves underneath. Sealing a deck up tight is how you shorten its life.

Railings and code

Anything more than about 24 inches off grade needs a guard, and the height and spindle spacing are set by the Ontario Building Code. Glass and cable railings keep a lake view open; aluminum is the low-maintenance middle ground.

Recent work

Decks we've built

Grey composite front porch deck with wide mitred steps and built-in planter boxes in Sarnia
Raised backyard deck with white vinyl railing, stairs and lattice skirting
Overhead view of a hardwood deck, stone path and lawn in a finished backyard
New cedar board privacy fence running the length of a backyard property line
Black aluminum fence across a front yard finished with river stone and address numbers
Black aluminum fence panels behind a stone landscape bed and cedar shrubs

Questions

Frequently asked

Do I need a building permit for a deck?
Generally yes if the deck is more than 24 inches above grade or attached to the house. Low free-standing platforms often don't need one. We handle the drawings and the permit application as part of the job so you're not chasing the municipality.
How long does a deck take to build?
A standard single-level deck is usually one to two weeks from the first footing to the final walkthrough, depending on size, weather and inspection timing. Multi-level builds with railings and built-ins take longer.
What drives the price?
Square footage, height off the ground, decking material, railing type, number of stairs and how hard the site is to get equipment into. Removing an old deck and disposing of it is a separate line on the quote.
Can you build a deck over the winter?
We can frame in cold weather and often do, but footings need workable ground and composite boards shouldn't be installed when it's very cold. Winter is a good time to design and permit so you're first in line in the spring.
What warranty comes with it?
Our workmanship is warrantied, and composite decking manufacturers typically back their boards for 25 years or more against fade and stain. We give you the paperwork at the walkthrough.

Free on-site visit

Get a straight price

Send us the basics and we'll book a time to come out. We measure the space, talk through materials and put a written quote in front of you. No charge, no pressure.

Prefer to talk? (519) 541-2468

Get a free quote

No obligation — the site visit and the quote are free. By sending this you're asking us to get back to you, so we may call, text or email you about your request. We don't share your details or send marketing. See our Privacy Policy.

Ready to start?

Tell us what you're thinking about and we'll come out, look at the space and give you a straight price. No charge for the visit.

Call nowFree quote